A scanned, worn historical map from the 1940s of the rural electrification area around Aughmore. A hand‑drawn boundary outlines the region, including Brackloon and Kilmovee.Area: Aughamore
Started: December 1953
Finished: August 1954
Poles used: 1310
Line used (km): 115
Premises connected: 395

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.