Area: Ballinamult
Started: August 1953
Finished: July 1954
Poles used: 1562
Line used (km): 152
Premises connected: 310
The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.
The REO News from September 1954 mentions the bad weather which occurred during the development.