Skip to Content
A scanned, worn historical map from the 1940s of the  rural electrification area around Ballybrittas. A  hand‑drawn boundary outlines the region.

Area: Ballybrittas
Started: August 1950
Finished: June 1951
Poles used: 1262
Line used (km): 103
Premises connected: 200

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.