A scanned, worn historical map from the 1940s of the rural electrification area around Ballycastle. A hand‑drawn boundary outlines the region, including Moygownigh.Area: Ballycastle
Started: July 1949
Finished: January 1950
Poles used: 562
Line used (km): 46
Premises connected: 62

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.