A scanned, worn historical map from the 1940s of the rural electrification area around Ballycroy. A hand‑drawn boundary outlines the region.Area: Ballycroy
Started: January 1964
Finished: April 1964
Poles used: 265
Line used (km): 56
Premises connected: 182

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.