A scanned, worn historical map from the 1940s of the  rural electrification area around  Caherdaniel. A hand‑drawn boundary outlines the region, including Waterville.Area: Caherdaniel
Started: August 1962
Finished: June 1964
Poles used: 1211
Line used (km): 98
Premises connected: 370

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.