Skip to Content

A scanned, worn historical map from the 1940s of the  rural electrification area around Clashmore. A  hand‑drawn boundary outlines the region.Area: Clashmore
Started: April 1958
Finished: October 1958
Poles used: 1003
Line used (km): 86
Premises connected: 184

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.

The REO News from August 1958 featured some photographs of the area showroom in Clashmore.