A scanned, worn historical map from the 1940s of the  rural electrification area around Clochane. A hand‑drawn boundary outlines the region, including Ballydavid.

Area: Cloghane
Started: August 1953
Finished: March 1954
Poles used: 598
Line used (km): 53
Premises connected: 111

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.