A scanned, worn historical map from the 1940s of the  rural electrification area around clontuskert. A  hand‑drawn boundary outlines the region.Area: Clontuskert
Started: January 1962
Finished: May 1962
Poles used: 998
Line used (km): 84
Premises connected: 25

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.