Skip to Content

A scanned, worn historical map from the 1940s of the  rural electrification area around Coole. A  hand‑drawn boundary outlines the region.Area: Coole
Started: May 1949
Finished: September 1949
Poles used: 641
Line used (km): 57
Premises connected: 60

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.As we work through the process of digitising our collections, if we find any other content for this area then we will publish it here.