Area: Coolkellure
Started: April 1962
Finished: November 1962
Poles used: 720
Line used (km): 63
Premises connected: 157
The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.