“A scanned, worn historical map from the 1940s of the rural electrification area around Dromamair. A hand‑drawn boundary outlines the region, including Killarca and Glenade.Area: Dromahair
Started: August 1960
Finished: April 1961
Poles used: 1362
Line used (km): 117
Premises connected: 360

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.