A scanned, worn historical map from the 1940s of the  rural electrification area around Drung. A  hand‑drawn boundary outlines the region.Area: Drung
Started: May 1958
Finished: December 1958
Poles used: 1077
Line used (km): 94
Premises connected: 127

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.