A scanned, worn historical map from the 1940s of the  rural electrification area around Durrow. A  hand‑drawn boundary outlines the region.Area: Durrow
Started: October 1958
Finished: April 1959
Poles used: 1450
Line used (km): 114
Premises connected: 130

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.