A scanned, worn historical map from the 1940s of the  rural electrification area around Glendine. A hand‑drawn boundary outlines the region, including Clonmult, Gortroe and Ballynoe.Area: Glendine
Started: November 1962
Finished: October 1963
Poles used: 692
Line used (km): 61
Premises connected: 150

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.