Area: Hospital
Started: January 1949
Finished: July 1949
Poles used: 955
Line used (km): 86
Premises connected: 350
The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our interactive map page. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.
Head office were satisfied with the work done in Hospital according to The REO News from August 1949.

This digital scan from the REO News displays the following text:
"Our congratulations go to the Area Engineer, Mr. T. P. Haugh, Supervisor Drennan, A.O. Brosnan and Area Clerk O’Reilly as well as the hard working crew of the Hospital Area on the results of their work there.
It was estimated that the return would be 9.6% while although the area is only completed a month or two, and that in the middle of summer, the actual connections show a return of 9.8%. Small figures — but they mean a lot."