Area: Kealkil
Started: October 1957
Finished: September 1958
Poles used: 1125
Line used (km): 95
Premises connected: 140
The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.