A scanned, worn historical map from the 1940s of the rural electrification area around Kilcogy. A hand‑drawn boundary outlines the region, including Dring, Kilnaleck, and Abbeylara.Area: Kilcogy
Started: April 1960
Finished: November 1960
Poles used: 1272
Line used (km): 116
Premises connected: 140

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.