Area: Kildavin
Started: September 1955
Finished: June 1956
Poles used: 1491
Line used (km): 131
Premises connected: 212
The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.