Skip to Content

A scanned, worn historical map from the 1940s of the rural electrification area around Kildimo. A hand‑drawn boundary outlines the region, including Askeaton, and Patrickswell.Area: Kildimo
Started: July 1949
Finished: March 1950
Poles used: 1242
Line used (km): 106
Premises connected: 395

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.