Skip to Content

A scanned, worn historical map from the 1940s of the  	rural electrification area around Lisacul. A hand‑drawn boundary outlines the region, including Kilmovee, Edmonstown, Aushamore, Lisacul and Kilkeevin.

Area: Lisacul

Started: January 1962
Finished: August 1962
Poles used: 1112
Line used (km): 86
Premises connected: 443

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.