Area: Melleray
Started: September 1961
Finished: October 1961
Poles used: 554
Line used (km): 50
Premises connected: 134
The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.