A scanned, worn historical map from the 1940s of the rural electrification area around Oram. A hand‑drawn boundary outlines the region, including Clontibret, Annayalla, and Lough Egish.Area: Oram
Started: October 1957
Finished: June 1958
Poles used: 1516
Line used (km): 138
Premises connected: 367