Area: Pontoon
Started: September 1958
Finished: January 1959
Poles used: 418
Line used (km): 35
Premises connected: 142
The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.