A scanned, worn historical map from the 1940s of the rural electrification area around  Quin. A hand‑drawn boundary outlines the region, including Clarecastle, and Tulla.Area: Quin
Started: December 1947
Finished: August 1948
Poles used: 611
Line used (km): 51
Premises connected: 138

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.