Area: Ballineen
Started: February 1960
Finished: September 1960
Poles used: 1020
Line used (km): 90
Premises connected: 97
The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our Interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.