Area: Ballinspittle
Started: December 1955
Finished: September 1956
Poles used: 1722
Line used (km): 142
Premises connected: 181
The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our Interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.