A scanned, worn historical map from the 1940s of the  rural electrification area around Tracton. A hand‑drawn boundary outlines the region, including Ballinhassig, Belgooly, Monkstown and Ballinspittle.

Area: Tracton
Started: May 1961
Finished: December 1961
Poles used: 717
Line used (km): 100
Premises connected: 289

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our Interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.