A scanned, worn historical map from the 1940s of the  rural electrification area around Tarmon. A  hand‑drawn boundary outlines the region.Area: Tarmon
Started: July 1956
Finished: September 1957
Poles used: 1431
Line used (km): 132
Premises connected: 240

The figures above were sourced from our REO News magazine, to learn more about what these figures mean, visit our  interactive map. The map above shows the area boundary and is from a digitised version of the original map used during the scheme.